Pohang Accelerator Lab replaced the linac injector original ICT charge monitors by new Turbo-ICT.
The original ICT with signal processing in time domain was overly disturbed by EM noise from the source and dark current.
Both problems are resolved to satisfaction by Turbo-ICT frequency domain signal processing.